When we passed signal 238-2, south of Watts, it was showing approach, meaning the H train would take the siding at Watts. I initially thought theyd be working there(they would). As we came around the curve into Watts, we got a surprise, this southbound grain train waiting on the main for the H train to clear. The crew is out, rolling the H train by as he goes into the siding. |