There are two of these footbridges across the two outbound lines in the departure yard, built at the spots where the locomotive consists of the second and third train sections will be located when they are coupled to the first section, so as to enable crews to cross the lines safely to where their minibus transport will pick them up after coupling up. See also the Wikipedia articles on the South African Class 43-000 and South African Class 15E. |
Date:
2/10/2013 |
Location:
Saldanha, WC, WC ZA  |
Views:
552 |
Collection Of:

Col André Kritzinger |
Locomotives: |
Author: Col André Kritzinger
|
 |
Picture Categories: Yard |
This picture is part of album: Sishen-Saldanha Iron Ore Export Line (OREX) |